The project on Orchard Street in the Village seeks to address the neighborhood’s ongoing drainage challenges. WM Schutt Engineering, the Village’s appointed engineer, and the DPW are working to complete the project in three stages. First, a topographic survey and base map will be prepared. Next, new concrete gutter curbing will be designed and installed. Finally, a new deep well and two catch basins will be designed and constructed at the intersection of Franklin and Orchard, with a pipe connection between them.
Please note this project is currently experiencing a delay as a resident on Orchard is having a pool installed on their property, and work will resume after that is complete. Thank you for your understanding.
Questions – Call Village Hall at 716-632-4120, we are available Monday-Friday 8-4 to help! Thank you for your continued patience and cooperation.